Wednesday 8 February 2012

Production Schedule

21st of February onwards I need to start and design my magazine rough cut (draft1) on Photoshop and In Design as the deadline for it is Monday March 5th

Article Drafts – Monday 27th February
I have set myself this deadline as I feel I will be able to research, plan and create a rough draft of my article for my DPS by this time and it will allow me to get my other work done as well

Photography - Friday 2nd March
I have set myself this deadline as I feel it is a reasonable length of time to get my photography done from now as i have a variety of shot locations that i need to go to.

Double Page Spread - Friday 2nd March
By this date i will have my article finished so i think it is reasonable to have the double page completed by then as all i will need to do will be to organise the page and add the images etc.
Contents Construction – Tuesday 28th February The contents page will not take too long to design as i already know how i want to design it so i think that it is a reasonable time to get it finished by.
Front Cover Construction – Tuesday 28th February
The front cover will take me a while but i think that this is a reasonable time as i want to get this finished first because i will need to dedicate my time to other thing such as photography and construction of my DPS.